PROJECT MANAGEMENT

1. Project management for new build rig construction / refurbishment / repair of jack up rigs.

          a. We provide project management personnel.
          b. Plan and schedule new projects.
          c. Evaluate and report status of ongoing projects.
          d. Prepare scope of work, cost and time estimates.

 


2. On site inspection of rig construction / refurbishment / repair.


a. Supervise on going projects.
b. Inspect and report on projects for clients.
c. Mechanical completion inspection.
d. Commissioning and handover of rig systems.

 

 

3.  Review of drawings/procedures to meet Class / Operational requirement.
 

 a. Design drawing reviews.
 b. Commissioning procedure reviews.
​ c. As-built drawing reviews.

NEW BUILD CONSTRUCTION

Jack Up Project Solutions (JUPSOL) provides established leading facilities for the construction of new build jackup drilling rigs with a highly sophisticated engineering capability and custom-built construction and load out facilities.

 

JUPSOL has rapidly gained a reputation as a reliable and professional builder of state-of-the-art drilling rigs for the international market.

 

JUPSOL has a depth of experience and expertise with the capability to perform high pressure, high temperature drilling operations in semi harsh environments.

Feel Free to Contact us by filling the request Quote Form,we're here to help.

RIG REPAIR / REFURBISHMENT

Over the years Jack Up Project Solutions (JUPSOL) rig refurbishment scope varies with every project and can range from a simple repair to a major refurishment lasting several months for the upgrade or replacement of old, obsolete and sometimes damaged equipment and machinery.

 

JUPSOL consistently strives to operate and maintain exceptional standards of safety and operational excellence, with a skilled, highly motivated workforce continuously delivering projects of the highest quality and complexity.

 

Please take a moment to review the services offered, if you have any questions or need a service, just give us a call, we’re here to help.  

CONVERSION PROJECTS

 

Over the years Jack Up Project Solutions (JUPSOL) rig refurbishment scope varies with every project and can range from a simple repair to a major refurishment lasting several months for the upgrade or replacement of old, obsolete and sometimes damaged equipment and machinery.

 

JUPSOL consistently strives to operate and maintain exceptional standards of safety and operational excellence, with a skilled, highly motivated workforce continuously delivering projects of the highest quality and complexity.

 

Please take a moment to review the services offered, if you have any questions or need a service, just give us a call, we’re here to help.  

RIG SURVEY

Rig Survey involves meeting International Standards for Assessment & Certification including Class Requirements, Flag State requirements, IADC requirements, IMO requirements (SOLAS, MARPOL), MODU requirements.

 

Please take a moment to review the services offered, if you have any questions or need a service, just give us a call, we’re here to help.  

DOCUMENTATION

  • Management of construction drawings / documents.

  • Preparation final deliverable documentation package for new build rig projects / rig refurbishment projects.

  • Review of the rig equipment package and identifying mandatory documents.

  • Documentation for re-certification of rig, change of Class or change of Flag.

  • Documentation for re-certification of drilling systems.

ENGINEERING

1. Engineering solutions for Drilling operation related issues, drilling equipment layout, equipment specification, structural and piping layouts for jack up design and construction.
 

          Basic Design Calculations for the following:

      a. Jacking and fixation system specification.

      b. Loading condition calculations.

      c. Preload piping capacity calculation and tank layout.

      d. Raw water system layout and design.

      e. Utility system layout.

      f.  Drilling control system specification.

      g. Layout of mud treatment and handling equipments.

      h. Layout of drilling package.

      i.  Layout of drilling package.

      g. Tubular handling and storing capacity calculations.

      h. Bulk mud/cement/drill water/base oil/brine system              capacity calculations.

       l. Drilling mud system capacity.

 

2. Engineering solutions for Marine (Jacking) operation related issues -

 

      a. Jacking system specifications and layout,

      b. Towing/ mooring system layout and

      c. Other marine system related issues.

3. Drawings and design package for secondary structure on rig :

 

Engineering and fabrication drawings for refurbishment of secondary structure on jack up rigs such as;

a. Shaker house, Mud pits, Mud ditches,

b. Drawworks shed, MWD/Mud lab platforms.

c. Texas Deck, BOP Platforms, Conductor tensioning platforms

d. Cantilever Extensions

e. Piping design and drawing using PDMS (3D) and analysis in                           CAESAR II.

f. Preparation of Inspection test procedure/ commissioning procedure/

   MC documents.

4. Revision of following document for existing rig:

 

a. Marine Operations Manual.

b. Fire, Safety and Escape Plans.

c. SOPEP Manual. 

d. Hazardous Area Plan

e. Pad eye and lifting gear register.

5. Jack Up Drilling Rig Location Suitability Study:

 

a. Plotting rig position against well head jackets.

b. Footprint suitability study

c. Leg penetration analysis.

d. Leg extraction analysis

e. Location suitability study.

KS_MEDSTAR-1
KS_MEDSTAR-1
SPUDCAN PENETRATION ANALYSIS
SPUDCAN PENETRATION ANALYSIS